Ir para o conteúdo
logo
  • Estudos
    • Geração Distribuída
      • Português
        • Estudo Estratégico de Geração Distribuída 2025
      • English
        • Strategic Report 2025: Distributed Generation
    • Geração Centralizada
      • Estudo Estratégico Grandes Usinas Solares 2025
      • English
        • 2024 Strategic Study Utility Scale PV Market Brazil – Executive Summary
    • Armazenamento
      • English Version
    • GD Remota
      • Português
        • Sumário Executivo Estudo de GD Remota 2023
      • English
        • Executive Summary Remote Distributed Generation Study 2023
      • Ranking Estruturas
    • Ranking de GD Remota
    • Loja
  • Insights
    • Webinars
    • Artigos
    • Greener Talks
    • Greener Summit Talks
    • Greener Insights
  • Eventos
    • Greener Summit 25
    • Meet & Greener 2025
  • Todos os Serviços
  • Portal de Transações
    • Boletim de M&A 1ºtri 2025
    • M&A Report 1st Quarter 2025
    • Boletim de M&A 3ºtri 2024
  • Patrocínio
  • Greener Summit
  • Estudos
    • Geração Distribuída
      • Português
        • Estudo Estratégico de Geração Distribuída 2025
      • English
        • Strategic Report 2025: Distributed Generation
    • Geração Centralizada
      • Estudo Estratégico Grandes Usinas Solares 2025
      • English
        • 2024 Strategic Study Utility Scale PV Market Brazil – Executive Summary
    • Armazenamento
      • English Version
    • GD Remota
      • Português
        • Sumário Executivo Estudo de GD Remota 2023
      • English
        • Executive Summary Remote Distributed Generation Study 2023
      • Ranking Estruturas
    • Ranking de GD Remota
    • Loja
  • Insights
    • Webinars
    • Artigos
    • Greener Talks
    • Greener Summit Talks
    • Greener Insights
  • Eventos
    • Greener Summit 25
    • Meet & Greener 2025
  • Todos os Serviços
  • Portal de Transações
    • Boletim de M&A 1ºtri 2025
    • M&A Report 1st Quarter 2025
    • Boletim de M&A 3ºtri 2024
  • Patrocínio
  • Greener Summit

Strategic Study

Remote DG in Brazil

2023 Version

Distributed Generation plants have gained ground with the advancement of the Remote DG in Brazil.

Given this scenario, how did photovoltaic power plant projects perform in 2023 and what are the expectations for future investments?

Check out the main highlights below:

Download the Study

80 pages of free analysis!

Executive Summary

Strategic Study

Remote
Distributed
Generation in Brazil

Photovoltaic Market

Construction and operation progressed in 2023
4.2 GW of plants in operation and/or under construction. A significant advancement compared to the 2.3 GW in 2022.
Investments of more than US$ 2 billion in the upcoming years
The market for new implementations of large Remote DG plants is expected to surpass 3 GW in 2024 and in part of 2025, reflecting investments of over US$ 2 billion in the next 2 years.
Clique aqui
The retail and services sectors stand out in investments
Advance of shared generation, especially demanded by consumers in the retail and services segments. Individual consumers showed significant progress compared to 2022.
Clique aqui
The attractiveness of "DG II" depends on macroeconomics and regulation
Reduction in equipment prices, a decrease in interest rates, and taxation are factors that can contribute to a greater attractiveness of DG II. Point of attention for defining new regulatory rules after 2029/2031.
Clique aqui

Shared Generation:

Customer Profiles

DG Management Companies
Move the cursor to see the values.

With 16% of the total, individual consumers showed significant progress compared to the study conducted in 2022, where they represented 7% of the total.

This factor indicates a trend toward an increased participation of this profile in shared generation.

Challenges in Asset Structuring

Asset Owners

Move cursor to see the values.

Grid connection and funding represent the biggest challenges in the feasibility and implementation, but the accelerated volume of new projects in light of the limited number of experienced builders in photovoltaic plants makes hiring EPC contractors also cited as one of the main challenges.

*There were also options for responses such as “Greenfield Project Offer” and “Final Consumer Prospecting.” Neither was identified as the primary challenge.

*Note: The response only allowed the selection of one option.

Asset Performance

Asset Owners
Move cursor to see the values.

How do you rate the performance of assets with 1 year or more in operation?

83% of companies consider asset performance to be within expectations. 

10% consider performance to be below expectations, with the main reasons cited as management issues, network unavailability, and weather-related issues.

Download the complete study using the form on the right.

Access more content and analysis.

Get access to the project pipelines, project volumes and statuses, power plant performance, investment expectations, feasibility considering potential future regulatory scenarios and other analyses.

Download the complete study through the form on the right.

Access more content and analysis.

Gain access to the project pipeline, project volumes and statuses, power plant performance, investment expectations, feasibility considering potential future regulatory scenarios, and other analyses.

 
Download the Study

Greener thanks it's sponsors:

Sponsorships:

  • Institucional
  • Contato
  • Carreiras
Facebook Linkedin Instagram Youtube

Greener Consultoria Ltda. © 2024

Rua Funchal, 573, cj. 82 – 04551-910 – Vila Olímpia, São Paulo, Brasil

 

LISTA DE ESPERA
ESTUDO ESTRATÉGICO DE ARMAZENAMENTO

Informe seus dados para concluir seu cadastro.